The new plan is to get the convertible running for the 2009 CLC Grand National in Las Vegas.
First chance I get, I will finish the rear brakes, and change all the fluids. Oil, transmission, power steering, brake, coolant. and check the compression on the engine.
No comments:
Post a Comment